top of page

2018

MUSEUM MASTERPLAN

Office:  Bjarke Ingels Group 2018

Position: Design Assitant

Type: Masterplan

Location: Confidential

Duration:  10 weeks

Graphics: By Joshua unless otherwise noted.

                Content property of BIG

Phase: Competition

Status: Not Selected

In the act of designing this project my roles included but were not limited to concept and massing development, complex facade 3D modeling, physical model making. Throughout the project I was fortunate to take the lead on producing final visualization material. Additionally in a short 2 week period following the design submission I was tasked along with another colleague to learn Unreal Engine and produce 3 minute long cinematic animation as a critical competition submission.

bottom of page