top of page
2018
MUSEUM MASTERPLAN
Office: Bjarke Ingels Group 2018
Position: Design Assitant
Type: Masterplan
Location: Confidential
Duration: 10 weeks
Graphics: By Joshua unless otherwise noted.
Content property of BIG
Phase: Competition
Status: Not Selected
In the act of designing this project my roles included but were not limited to concept and massing development, complex facade 3D modeling, physical model making. Throughout the project I was fortunate to take the lead on producing final visualization material. Additionally in a short 2 week period following the design submission I was tasked along with another colleague to learn Unreal Engine and produce 3 minute long cinematic animation as a critical competition submission.
![Museum Master Plan](https://static.wixstatic.com/media/c7369c_f2082f431b5b482fa2fc975ef5a7b6e9~mv2.jpg/v1/fit/w_980,h_551,q_90/c7369c_f2082f431b5b482fa2fc975ef5a7b6e9~mv2.jpg)
![Museum Master Plan](https://static.wixstatic.com/media/c7369c_9190fd3972454df1b940caef1ee618cf~mv2.jpg/v1/fit/w_980,h_582,q_90/c7369c_9190fd3972454df1b940caef1ee618cf~mv2.jpg)
![Museum Master Plan](https://static.wixstatic.com/media/c7369c_ee9fb46727a9416a9ce0587ed87338c6~mv2.jpg/v1/fit/w_980,h_509,q_90/c7369c_ee9fb46727a9416a9ce0587ed87338c6~mv2.jpg)
![Museum Master Plan](https://static.wixstatic.com/media/c7369c_1062f2d507dc4fc5b23236e17bb00065~mv2.jpg/v1/fit/w_980,h_184,q_90/c7369c_1062f2d507dc4fc5b23236e17bb00065~mv2.jpg)
![Museum Master Plan](https://static.wixstatic.com/media/c7369c_ef9d9809066240418ac5e344bded5785~mv2.jpg/v1/fit/w_980,h_551,q_90/c7369c_ef9d9809066240418ac5e344bded5785~mv2.jpg)
![Museum Master Plan](https://static.wixstatic.com/media/c7369c_a20d66fec8184ec0965bfa819848789d~mv2.jpg/v1/fit/w_980,h_551,q_90/c7369c_a20d66fec8184ec0965bfa819848789d~mv2.jpg)
![Museum Master Plan](https://static.wixstatic.com/media/c7369c_7bdbcd07a0cc47a7b42d14b65cd8f9a2~mv2.jpg/v1/fit/w_980,h_132,q_90/c7369c_7bdbcd07a0cc47a7b42d14b65cd8f9a2~mv2.jpg)
bottom of page